How much is equipment downtime costing you?

One of the highest categories of forced outages on electrohydraulic controlled (EHC) steam turbines over the past 10 years has been the Turbine Trip and Monitoring System.


This system consists of electrical relays, mechanical valves, and the high pressure fluid system. In a majority of the cases, the fluid system was either directly or indirectly responsible for the forced outage. Fluid contamination was found to be the single biggest recurring problem with the high pressure fluid system.

Since the fluid is the heart of the system, contamination has become a major concern in maintaining unit reliability.

The only way to remove the harmful deposits is through a systematic flushing process that dissolves these deposits. The fluid that is used contains acids. These acids dissolve the deposits and flush them back to the reservoir where they are removed. The acids are then removed from the hydraulic system following the flush.

Highly contaminated EHC Fluid to fluid that's within Specification

A Flushing Service that will last...

The Flushing procedure includes the following elements:

  • An on-site meeting conducted prior to the flush to go over the details of the flush including scheduling man-power, supplies, etc...
  • A customized, flushing procedure based on years of experience.

  • A complete list of supplies needed for the flush including part numbers, quantities, and suppliers (i.e. fluid, filters, o-rings, etc.).
  • An external kidney loop filtering unit that assures no particulates are added to the system when adding fluid to the reservoir during the flush. This system considerably shortens the flush time.
  • Experienced on-site, system engineers to act as the technical directors for your supplied labor force to assure proper procedures are followed throughout the flush.
  • An on-site independent fluid analysis representative who will be taking fluid samples and analyzing the fluid throughout the flush.
  • A thorough written report detailing how the system was found, what was done, and how the system was left.

30 lbs of sludge was extracted from a system

Turbo Filtration Corporation
P.O. Box 850999
Mobile, Alabama 36685

Office: (251) 675-8820
Toll Free: 1-866-675-8820
Fax: (251) 675-8847

Specialist at what we do best - Mike Enger (owner), alone offers 25 years experience.
TFC Global has a combination of expertise and experience of more than 50 yrs.
We offer quality Turbine Generator
Lube Oil System Cleaning Service on Steam Turbines, Nuclear Turbines, Gas Turbines, Gas Units

Specialized Services
Turbine Lube Oil Flush ||Oil System Hydroblasting || Cooler Cleaning & Retubing ||
EHC System Flushing
|| Onsite Lab Service || Compressor Flushing || Equipment Sales & Rental

Copyright © 2006 Turbo Filtration Corporation. All rights reserved.
Problems with this page? contact support@tfcoilflush.com